How it works

What to expect, step by step

A new kitchen is a big decision. Here is exactly how a KO project runs, so there are no surprises from first chat to final hinge.

New kitchen cabinets set out and levelled during installation

The KO process

Six steps, one team

  1. 01

    Free design consult

    Nick or Kayle visits, measures up and talks through how you use the space, what you love and what is not working.

    • On-site measure
    • Ideas and honest advice
    • No obligation
    Week 1
  2. 02

    3D design

    Nick draws your project in CAD and shows you 3D views, with a round of revisions included.

    • CAD drawings and 3D views
    • Revisions included
    About 1 to 3 weeks
  3. 03

    Quote and deposit

    A clear, itemised quote with inclusions and exclusions. A deposit locks in your design and materials.

    • Itemised quote
    • Written contract
    When you are ready
  4. 04

    Final check measure

    We re-measure on site before production so every panel fits your walls.

    • Check measure
    • Final sign-off
    Before production
  5. 05

    Made and checked

    Panels are precision machined locally, then assembled and checked by us.

    • Dry-fit of complex pieces
    • Quality checks
    About 4 to 6 weeks to install
  6. 06

    Install and handover

    Our own team installs, coordinates stone and trades, then walks you through every drawer.

    • Tidy, protected site
    • Walk-through
    • Ongoing support
    Install week

Timings are a guide. Stone lead times, design decisions and building programs can move them, and we will give you a schedule for your project.

Behind the scenes

What happens between the steps

  1. 01

    Your kitchen, before it exists

    3D views let you check the flow, the finishes and the way light falls before a single board is cut.

    Your kitchen, before it exists
  2. 02

    Curves and details, dry-fitted

    Complex pieces like curved panels and banquettes are assembled and checked in our workshop first.

    Curves and details, dry-fitted
  3. 03

    Square, level and true

    Bases go in level, tall cabinets go in plumb, and doors get adjusted until every gap is even.

    Square, level and true
  4. 04

    Yours to enjoy

    We walk you through every drawer, hinge and light, and we are a phone call away afterwards.

    Yours to enjoy

Timing and payments

Process questions

What happens at the free design consult?

We come to you, measure up and talk through how you use the space, what you love and what is not working. Bring your Pinterest boards and photos. Afterwards we prepare 3D drawings and a clear quote.

How long does a new kitchen take?

As a guide, most kitchens are installed about four to six weeks after the final check measure, and the whole journey from first chat to installation is usually two to four months. Design decisions, stone lead times and your builder's program can move that either way, and we will give you a schedule for your project.

How do payments work?

We take a deposit to lock in your design and materials, then progress payments at final check measure and at delivery. Everything is set out in writing before work starts, in line with QBCC requirements.

Can I see my kitchen before you build it?

Yes. Nick draws every project in CAD and shows you 3D views before anything is made, with a round of revisions included. You can also play with ideas any time in our 3D kitchen designer.

Can you work with my existing layout?

Often, yes. Keeping plumbing and electrical where they are can save time and money, and a new layout of doors, panels, stone and lighting can transform a room on the same footprint. We will tell you honestly what is worth moving.

Ready for step one?

Book a free design consult. It costs nothing and you will come away with ideas either way.